Hi guys, i have a problem with Mean. I make an acquisttion and want use the mean of ten firsts point like one single point to start the rest of my test, but i cant stop the mean calculation on 10 point, the vi continues run. I wish to use the mean fo 10 points linke one single poit, and continue the acquisition normally in 11 and after. Can anyone help me?
Follow my VI in LV 2010